Promise Technology E610f Manual Página 52

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 51
VTrak E-Class Product Manual
30
Management Path
To establish the management path:
1. Connect the Management ports on both controllers to your network switch.
2. Connect the NICs in both Host PCs or Servers to your network switch.
Figure 17.FC no single point of failure management connections
Also see the FC controller close-up, on page 23, Figure 12.
RAID subsystem
Network Switch
Host PCs or Servers
Vista de página 51
1 2 ... 47 48 49 50 51 52 53 54 55 56 57 ... 435 436

Comentários a estes Manuais

Sem comentários